Multifamily Development: The Process From Land to Lease-Up

Multifamily development moves through seven phases, from land to a stabilized building. Here is what happens in each one and where operators should have a seat early.

Published 7 min readOwnership and Investing

Multifamily development is the process of turning land into a stabilized apartment building, and it moves through seven phases: site selection and feasibility, entitlements, design, financing, construction, pre-leasing and lease-up, and hand-off to operations. The phases overlap, and the decisions made in the first three set most of what the building earns for years.

We manage apartments in Reno, Sparks, Carson City and Lake Tahoe, so we see this from the end of the line: the owner gets the keys and we have to fill and run whatever was designed. This guide walks the phases in order and points out where an operator's input changes the outcome.

Phase 1: Site Selection and Feasibility

Feasibility answers one question before you spend serious money: does this site, with this building, make sense? You are testing four things.

  • Zoning and density. What can you legally build, and how many units does that give you?
  • Site conditions. Slope, soils, flood exposure, access, and distance to water, sewer and power.
  • Market demand. Who rents in this submarket, what do they pay, and how many comparable buildings are coming?
  • The numbers. Land plus building cost against the rent you expect.

Developers often boil the last test down to yield on cost: the stabilized net operating income divided by total project cost. Our glossary entry on yield on cost shows the formula. Investors then compare it with what similar buildings trade for, since a new building has to be worth more than it cost to justify the risk.

Do this step on paper, cheaply, and be willing to walk away. A weak site rarely gets better once the land is bought.

Phase 2: Entitlements and Zoning

Entitlements are the government approvals that let you build the use you want at the density you want. This is where timelines are hardest to predict, because it depends on people and processes you do not control.

Nevada changed the starting point for many sites. Under Nevada AB 241, local governments must allow apartments by right on commercially zoned land. By right means a project that meets the written standards gets approved without a rezoning hearing. Standards still apply, such as setbacks, parking, water and sewer service and building codes, and each city and county writes its own ordinance. Your attorney and the local planning office confirm what applies to your parcel.

A by-right site does not skip the rest of the process. You still need site plan review, building permits and utility approvals, and you should ask early which fees and studies the local jurisdiction requires.

Phase 3: Design and Unit Mix

Design turns an approved concept into drawings, and it is the cheapest place to make a change. Moving a wall on paper costs a revision. Moving it after the framing is up costs a change order and weeks.

The decisions that matter most to the owner:

  • Unit mix. How many studios, one-bedrooms and two-bedrooms, and at what sizes. This sets who your residents are and how fast units lease.
  • Amenities. Every amenity has a build cost and an operating cost. Ask what each one earns in rent or retention before you draw it in.
  • Building systems. Heating, cooling, water heating, laundry and metering decide your utility costs and your repair calls.
  • Operations space. Maintenance shops, storage, trash, package handling, parking and a leasing office that works.

The operating budget is mostly decided in design. Nobody can cut it later without tearing something out.

This is the moment to sit a property manager at the table. A manager who has run buildings like yours knows which finishes hold up, which layouts confuse residents and which amenities nobody uses.

Phase 4: Financing the Project

Most ground-up apartment projects combine owner or investor equity with a construction loan, then refinance or sell once the building is stabilized. Lenders want to see entitlements in hand, a credible budget, an experienced team and a lease-up plan that supports the debt.

HUD's Section 221(d)(4) program is one example of construction financing. HUD describes it as insuring mortgages for the new construction or substantial rehabilitation of multifamily rental housing with five or more units, with long-term loans of up to 40 years. Bank and other construction lenders offer different terms, so compare options with your lender or advisor and read the current program rules.

Whichever route you take, build lease-up into the plan. The building pays no rent while it is under construction, and it does not pay full rent the day it opens. A financing plan that assumes instant occupancy is a plan that runs out of cash. If syndication is part of your structure, talk to your securities attorney before you describe the deal to anyone.

Phase 5: Construction and Multifamily Construction Management

During construction, the questions are cost, schedule and quality. A general contractor builds. Someone on the owner's side has to watch the budget, review pay applications, run the meetings, track change orders and keep decisions moving. That role is multifamily construction management, and it exists to protect the owner's schedule and money.

What good oversight looks like in practice:

  1. A schedule that works backward from the date you want to open.
  2. Regular site walks, with photos and written notes.
  3. Change orders priced and approved in writing before the work happens.
  4. Early lead times on long items such as appliances, windows and electrical gear.
  5. Punch lists and walk-throughs that use the same standards your operations team will use after turnover.

Our multifamily construction management work keeps the end in mind: the team that will lease and run the building reviews what is being built while it can still be changed.

Phase 6: Pre-Leasing and Lease-Up

Leasing starts before the building is finished. Pre-leasing lets you collect interest, set pricing and line up move-ins for the first units to be released. Then comes lease-up, the stretch from the first move-in to stabilized occupancy, when the building reaches the level your lender and investors target.

Plan this early, because the work takes lead time:

  • A name, a website and a leasing page before there is a building to tour.
  • Marketing, photography and renderings.
  • A leasing team, systems and pricing rules.
  • Model units or a preview experience.
  • A rent schedule you can defend against nearby comparable buildings.

Our guide to lease up strategy covers the plan in detail. If you want a team to run it, that is what our lease up services are for. The most common mistake is waiting for the certificate of occupancy to think about leasing.

Phase 7: Stabilization and Hand-Off to Operations

Stabilization is the point where occupancy holds at your target level and the building runs without lease-up effort. Different lenders and investors define the target differently, so check the definition in your own loan documents and operating agreement.

At hand-off, the owner needs the same things any new building needs, and they should be ready before the first resident moves in:

  • Warranty lists, as-built drawings and equipment manuals in one place.
  • A preventive maintenance plan for every system.
  • Vendor contracts and emergency contacts.
  • An operating budget based on real quotes, not a guess.
  • Reporting that shows occupancy, rent and expenses against the plan every month.

Where Management Belongs in Multifamily Development

The mistake we see most often is treating management as a phase that begins at opening day. By then, the costly decisions are already built into concrete and drywall.

Bring an operator in at three points. In feasibility, to check rents and absorption assumptions against how buildings in the area actually lease. In design, to review unit mix, amenities and maintenance access. In construction, to walk the building before turnover and write the punch list with operations in mind. If your team has not developed before, multifamily development consulting from an operator can fill the gap without adding a permanent hire.

Your next step is to look at the phase you are in and ask who on your team has run an apartment building like this one. If the answer is nobody, that is the seat to fill.

Next step

Building new apartments in Northern Nevada?

We bring the operator's view into design, construction and lease-up, so the building opens ready to fill.

Talk to us
Share this article
  • #multifamily development
  • #new construction
  • #entitlements
  • #lease-up

Questions about multifamily development

What are the steps of multifamily development?
Multifamily development runs through site selection and feasibility, entitlements, design, financing, construction, pre-leasing and lease-up, then stabilization and hand-off to operations. Some phases overlap, and financing usually depends on feasibility and entitlements being far enough along.
How does the apartment development process start?
The apartment development process starts with a site and a feasibility test. You check that the zoning, utilities, ground conditions and local rents support the building you want before you commit real money to the land.
Does Nevada AB 241 make multifamily development easier?
It can, because Nevada AB 241 requires local governments to allow apartments by right on commercially zoned land, with standards. Each city and county writes its own version, so a site still needs a zoning check against the local ordinance.
What is HUD 221(d)(4) financing?
HUD 221(d)(4) is an FHA-insured loan for the new construction or substantial rehabilitation of multifamily rental housing with five or more units. HUD describes terms of up to 40 years, but it is one option among several, so compare it with bank construction loans.
Do I need multifamily development consulting?
Multifamily development consulting makes sense when your team has not built before, or when you want an operator's view on unit mix, amenities and the operating budget. It is the cheapest time to change those decisions, because nothing is poured yet.
When should a property manager get involved in multifamily development?
A property manager should join during design, well before construction ends. Unit mix, amenities, parking, storage and the maintenance plan all set your operating costs and rent for the life of the building.
Chris Foti avatar

Written by

Chris Foti

Founding partner at Next Level Property Management. Multifamily marketer, former investment company CEO and the force behind $100+ million in documented asset value growth.

Read Chris's profile
Ownership and Investing

How Much Do Property Managers Charge for Apartments?

The headline management fee is the least useful number in a proposal. Here's how apartment fee structures work, what should be bundled, and how to compare managers on what you keep.

· 10 min